Foundation investigation Zaandam knowledge base
This knowledge base covers one subject: the foundations of houses in Zaandam and the villages around it. What lies under Zaan houses, why things go wrong there so often, how we measure and what you should ask as a buyer. Everything is based on our own reports from the area, supplemented with what the municipality of Zaanstad publishes about it.
Looking for general information about a building inspection in this region? Read the Building inspection Zaandam knowledge base. This page goes deeper into the foundation.
This is the English version of our Kennisbank funderingsonderzoek Zaanstreek (in Dutch). We wrote it for expats and other English-speaking buyers in the Zaan region, because almost everything about Dutch foundations is only published in Dutch. What our clients say about us is on the page with English reviews of Premiumkeur Zaandam.
In brief
- Pre-war houses in the Zaan region usually stand on timber piles. According to the municipality of Zaanstad, decay by bacteria is the main cause of foundation problems; visible damage appears after about 70 to 100 years.
- In the late 1990s the municipality had 1,700 foundations investigated. Roughly one in three turned out to be poor. In 2023, according to the municipality, at least 2,500 homes still needed new foundations.
- The same things keep coming back in our reports from the Zaan region: a seller who says the foundation has been renewed without any paperwork, monitoring bolts without readings, extensions that have subsided and crawl spaces that are too wet.
- A quick scan (phase 0) costs € 399 and can only be booked together with a building inspection; together from € 898. Phase 1 costs € 699 to € 1,499, phase 2 from € 3,000 excluding excavation work.
- Foundation repair costs from € 2,500 per m², with a cellar from € 3,500 per m².
- Our advice: for a house built before 1970, have the foundation investigated before you sign the purchase contract. The year of construction tells you something about the type of foundation, not about its condition.
1. Foundations in the Zaan region
The Zaan region is low-lying, on clay and peat. In our reports that include archive or soil data, the top layers are always clay and peat, with a load-bearing sand layer only further down. Anyone who wanted to build solidly had to drive piles.
Until about 1970, homes in the Netherlands were often built on timber piles. The municipality of Zaanstad writes that pine in particular is vulnerable to decay and that it was no longer used under homes after 1970. Pre-war Zaan houses often stand on relatively short timber piles.
Which foundations we find in the region
- Timber piles under most pre-war terraced and end-of-terrace houses. You cannot see them above ground; we deduce them from the year of construction, drawings and the archive.
- Pad foundations (poeren): brick or concrete blocks, mainly under old timber houses and under the cellars of farmhouses. Whether these in turn stand on piles is often not recorded anywhere.
- Shallow foundation (fundering op staal): no piles, the walls stand on a widened footing in the ground. You find this under light extensions, sheds and conservatories, and sometimes under older detached houses.
- Concrete piles with a ring beam under houses from roughly the 1960s and 1970s onwards. They are stronger, but the ground beneath them can still settle.
Why it goes wrong
Timber piles that stand under water last a long time. According to the municipality of Zaanstad, bacteria still attack the wood slowly, especially pine. The municipality also mentions fungi when the wood dries out, negative skin friction with short piles (the sinking soil drags the piles down with it), land subsidence and renovations that put a heavier load on a house.
What we see in practice: cracks and tilting in the Zaan region rarely come out of nowhere. Usually something has been going on for years, and the signs have been plastered over, hidden behind false walls or repaired without anyone looking at the cause.
Timber pile foundation exposed in a trial pit. Only digging like this (phase 2) shows the condition of the piles.
Fred Tokkie in the excavation pit beside a foundation. The piles are assessed where the soil has been dug away.
2. What we keep finding in the Zaan region
When we put our foundation investigations and building inspections from the region side by side, six things stand out. The numbers refer to the practice cases in chapter 8.
The seller says the foundation has been renewed
In eight reports from the region, the seller, the occupant or the seller’s estate agent said during the inspection that the foundation had been renewed. In none of these cases was there any paperwork on the table, and we see the same in our older reports (cases 29, 32 and 33). Sometimes the crawl space had been filled or there was a new floor, and that was presented as proof (cases 1 to 5). A new floor or a crawl space full of foam concrete says nothing about the piles under the load-bearing walls. Without a repair report, drawings and a guarantee, we assume the original foundation.
Monitoring bolts, but no readings
Monitoring bolts (meetbouten) on a facade mean that someone is following the building, usually the municipality. At the inspection the readings are almost never available. And often the bolts are only on the front facade, while the back can subside just as well (cases 7, 12 to 15, 20 and 28). Ask for the series of readings before you sign. One measurement is a snapshot; only after a few years of measuring do you know how fast it is going.
Extensions that subside differently from the house
An extension, conservatory or shed often does not stand on piles but on a shallow foundation or a separate concrete slab. The main house and the extension then each subside in their own way, and it cracks at the joint between them. We saw this with a conservatory in Koog aan de Zaan (case 11), with an extension in Assendelft that was said to have new foundations (case 10) and just outside the region in Beets and Zuidoostbeemster (cases 37 and 38). With an extension we always ask for the building drawings.
Cracks that have been covered up
Rendered facades, brick slips and false walls are popular with renovators in the region. They make our job harder: we cannot see what is behind them. Cracks that have been repaired once and have opened up again are a clear sign that the movement is continuing (cases 15 and 21).
The crawl space is too wet
Many Zaan houses have a timber joist floor above a low, wet crawl space (kruipruimte). In our reports we see moisture readings of 20 to over 35% in the joists, where 12% counts as dry, with brown rot at the joist ends and rusting steel beams (cases 8 and 18 to 20). Strictly speaking that is not a foundation problem, but it often costs just as much money, and it belongs in the same conversation.
Not every house has a problem
We write that down too. In houses from the 1970s and 1980s on concrete piles, we often found almost straight facades, even when there were cracks or water in the crawl space (cases 23 to 26). Cracks in a facade do not always come from the foundation; shrinkage, missing expansion joints and poor brickwork also cause cracks.
3. Signs you can see for yourself
- Cracks in the facade, especially stepped cracks through the joints or diagonal cracks from the corners of windows and doors.
- Cracks that were filled before and have opened up again.
- Windows and doors that stick or hang visibly crooked in the frame.
- Floors that slope; a marble that rolls away is not a measurement, but it is a reason to have the floor measured.
- A clear joint or crack between the house and the extension.
- Monitoring bolts on your facade or on the neighbours’ facade.
- Neighbours who already have a new foundation, or who do not, where you share a party wall.
- A crawl space that smells damp, standing water, or a hatch that has been screwed shut.
None of these signs proves a foundation problem on its own. Only measurements show whether the house has subsided, and in which direction. If you are worried about a crack in a house you already live in, a crack investigation (from € 499, see our services and rates, in Dutch) can give you clarity.
Patched brickwork in a front facade. Cracks that were repaired once and open up again point to movement that is still going on.
Going into the crawl space of a house in Zaandam. A hatch that has been screwed shut, or standing water, counts as a risk in our advice.
4. Types of foundation investigation and what they do and do not tell you
Quick scan (phase 0)
An above-ground investigation during the building inspection (bouwkundige keuring); see our page on the foundation risk investigation phase 0 (in Dutch). We measure the bed joints (the horizontal joints in the facade, which were level when the house was built) and the floors, look at cracks and, where possible, search for archive data. There is no digging. The quick scan costs € 399 and can only be ordered together with a building inspection; together from € 898. The inspection and quick scan together take about 1.5 hours and you have the report within 2 working days.
A quick scan tells you how crooked the house is now and whether that points to a foundation problem. It says nothing about the condition of the piles themselves and nothing about the speed of the subsidence.
Phase 1
A more extensive above-ground investigation following the KCAF guideline (the Dutch guideline for foundation investigations): more measuring points, all floors, crack analysis and archive research. € 699 to € 1,499, depending on how in-depth the investigation is. Phase 1 does not look underground either.
Phase 2
The foundation is excavated at one or more spots. The piles and the wood are assessed, sometimes with wood samples in a laboratory. Only phase 2 gives certainty about the piles. From € 3,000, excluding excavation work. According to the municipality of Zaanstad, a soil survey (bodemonderzoek) is also needed before foundation investigation or repair.
Monitoring bolts
Bolts in the facade that are measured periodically. After a few years you know how fast the house is subsiding. We place 8 to 10 bolts for € 1,179. If a building subsides evenly by less than 1 to 2 mm per year, further investigation is usually not needed; above 2 mm per year, phase 1 or phase 2 follows. For a house on a shallow foundation, monitoring bolts often make more sense than a phase 2. If there are already municipal monitoring bolts, the owner can request the measurement report.
The Zaanstad foundation map
The municipality keeps a foundation map (funderingskaart) showing which buildings from before 1951 have been investigated or repaired and where monitoring bolts are. Useful, but the municipality itself adds that the data may be outdated or incomplete and that no rights can be derived from it. In a case from Zaandam, the map showed a repair from 2003, but we did not find a single document in the building archive (case 1).
The foundation label
Since 1 April 2026 every valuation report includes a foundation label (funderingslabel) from A to E. It is a risk indication based on, among other things, year of construction, groundwater and satellite data, not an investigation of your house. You can read more about it on our page about the foundation label (in Dutch).
5. How we measure
- Bed-joint measurement (lintvoegmeting): with a laser we measure how a continuous joint runs across the facade. It was level when the house was built, so every difference is movement, or sometimes sloppy bricklaying. If that is the case, we say so.
- Floor levelling (vloerwaterpassing): we measure the floors on all accessible storeys. A ground floor that was renewed later is often straight, while the floor above shows the real tilt (case 10).
- Plumb measurement (loodmeting): how far a facade leans forwards or backwards.
- Crack analysis: the direction, width and position of cracks tell us whether they fit with settlement or rather with shrinkage or temperature.
- Archive and map: building drawings, earlier repairs, monitoring bolt data and the municipal foundation map.
We express a measured height difference as a rotation: the height difference divided by the length over which it was measured. 27 mm over 2.2 metres is a rotation of 1 in 81, and in the KCAF guideline that falls into a severe category (case 6). The same height difference over 10 metres is much less serious.
Where we cannot measure, we write that down: a rendered facade has no bed joint, we cannot get into a full crawl space, and we do not open a hatch that has been screwed shut. What we could not see counts as a risk in our advice.
Bed-joint measurement: the laser receiver is held on the same horizontal joint at several points along the facade.
Floor levelling with a laser line and a measuring staff. We measure every accessible floor, not only the ground floor.
Foundation investigations in the Zaan region on video
These videos from our YouTube channel are in Dutch, but they show what we do on site: measuring facades and floors, looking for cracks and explaining the result to the buyer.
Foundation risk investigation in Zaandam (in Dutch)
A foundation risk investigation (quick scan, phase 0) at a house in Zaandam, carried out during the building inspection.

Video: Funderingsonderzoek Zaandam
Foundation investigation in Zaandam (in Dutch)
A foundation investigation at a house in Zaandam: how we look at the facade, the cracks and the floors.

Video: Funderingsonderzoek Zaandijk
Foundation investigation in Zaandijk (in Dutch)
A foundation investigation at a house in Zaandijk, one of the villages along the Zaan with many pre-war homes.
What a shallow foundation looks like (in Dutch)
What a shallow foundation without piles (fundering op staal) looks like, the type you often find under extensions and sheds.
6. Buying a house in the Zaan region: what to ask
- Have it investigated before you sign. After signing you still have a 3-day cooling-off period (bedenktijd), and after that the risk is yours. A dissolving condition (ontbindende voorwaarde) for a building inspection with a quick scan gives you room.
- If you hear “the foundation has been renewed”, ask for the paperwork: the foundation report, the repair plan or drawings, the structural calculation, the invoices, the completion report and the guarantee. And ask whether the whole house has been repaired or only part of it, for example only the front facade or only the extension.
- Ask for the readings if there are monitoring bolts on the facade, including those of the neighbours if you share a party wall.
- Check the foundation map and ask the seller what he knows. The seller must share known foundation information; as a buyer you must also ask about it.
- Look at the whole block. Repairing one house in a terrace often leaves a problem at the party wall with the neighbours. The municipality advises repairing per block, and you need written permission from the neighbours.
- An apartment? Then the owners’ association (VvE) pays for the repair and each owner contributes in proportion. Ask for the minutes, the long-term maintenance plan (MJOP) and the balance of the reserve fund.
Do not have the foundation investigated by a company that also carries out repairs, or one recommended to you by the seller’s estate agent. A free or cheap inspection by a company that earns from the follow-up work is hard to check. That applies to foundations just as much as to free roof inspections at the door; with doorstep sales, be aware of your rights (Dutch government, in Dutch).
Choose your own inspector, not one from the agent’s network
Because the Dutch buying process is new to many expats, it is natural to follow the suggestions of your estate agent. Keep in mind that an agent is usually paid when the sale goes through, and that an inspector who gets a lot of work through agents has an interest in that relationship. This applies to the buying agent too. You are free to bring your own inspector, also when an agent or mortgage adviser mentions a “partner”. Questions worth asking any inspector: Do you receive work or fees from estate agents or mortgage advisers? Will you go into the crawl space and onto the roof where it is safe? Do you assess the foundation? Can you confirm your independence in writing? Also read the terms and conditions, for example whether the inspection is only “global” and whether roof, crawl space or foundation are excluded.
Premiumkeur does not work with estate agents or mortgage advisers, pays or receives no fees, does not recommend repair companies and does not inspect for sellers. Our inspector explains the findings on site in English if you like. The standard report is in Dutch; we can translate it into English for € 100 extra.
7. Foundation repair: costs, rules and help from the municipality
Foundation repair costs from € 2,500 per m² of floor area, and from € 3,500 per m² with a cellar or when a cellar is added (starting prices, price level 2025). On top of that there is almost always the finishing work: floors, pipes, kitchen and decoration, from € 3,000 per m². Facade cracks and a poor crawl space come after the repair as well (see the amounts in the cases). We deliberately give a price per m² and not a total, because the differences between houses are large. An amount from a specific report is given in the cases.
Foundation repair requires an environmental permit (omgevingsvergunning). Neighbours who repair together can apply for one permit. According to the municipality, a soil survey must be done before the investigation or the repair.
Subsidy and advice in Zaanstad
The municipality of Zaanstad has a foundation desk (funderingsloket) for questions about recognising problems, investigation and repair (075-6552227, funderingsloket@zaanstad.nl). Under the 2026 subsidy scheme (in Dutch), the municipality reimburses among other things 75% of the cost of a foundation investigation, up to € 3,300 for one home and up to € 3,500 for a joint investigation. There is also a contribution for insulating during the repair and for demolition and new build if repair is no longer worth it. You can apply until 31 December 2026 or until the money runs out. Always check the current conditions with the municipality itself.
We only give independent advice and do not recommend foundation repair companies or contractors. That keeps our judgement of your house separate from whoever earns from the repair.
8. Practice cases from our reports
Below are cases from our own reports from the Zaan region, grouped by what they show. They are foundation investigations, building inspections and crawl space inspections from 2016 up to and including 2026. We leave out addresses and names. A building inspection is not a full foundation investigation; we say so each time. Each amount comes with the year of the report as its price level.
Cases where the seller said the foundation had been renewed
Case 1: Mid-terrace house from 1933, Zaandam, April 2026
Situation: A separate quick scan for the buyer of an apartment. The seller’s estate agent said the foundation had been renewed, and the municipal foundation map mentions a repair in 2003.
Findings:
- In the building archive we found no documents about that repair.
- Floor: locally at most 6 mm height difference, 2 mm along the party walls. Front facade: 7 mm over just over 7 metres.
- Two light cracks in the front facade, no sticking doors.
- Facades and floors had recently been renewed.
Advice and costs: Low risk, but ask the seller or the VvE for the repair documents, and otherwise for a written statement from the owner.
What this shows: Straight after a renovation says something about the years since that renovation, not about the piles.
Case 2: Detached house from 1927, Zaandam, February 2025
Situation: Building inspection. We had offered a foundation investigation; the buyer chose only the inspection.
Findings:
- There was no crawl space any more, because the house was said to have new foundations. We did not see any paperwork for this.
- Cracks in the brickwork in many places, according to the inspector most probably caused by foundation problems. Repairing pointing and brickwork: € 1,500.
- Floor of foam concrete, with all pipes cast into it.
Advice and costs: Ask the seller’s estate agent for proof that the foundation has been completely renewed, and have the pipes checked before you sign.
What this shows: Cracks that point to the foundation fit poorly with a house that is said to have new foundations.
Case 3: Detached house from 1910, Krommenie, July 2024
Situation: Building inspection in a foundation risk area, without a foundation investigation.
Findings:
- Many cracks above the window frames and many old repairs. On the left of the front facade the brickwork at ground level had been pushed outwards.
- According to the estate agent, the crawl space had been filled with foam concrete.
- Pointing all round the house: € 5,250.
Advice and costs: Additional foundation investigation before signing the purchase contract.
What this shows: A crawl space full of foam concrete is separate from the walls. It says nothing about the foundation under the load-bearing walls.
Case 4: End-of-terrace house from 1928, Wormerveer, September 2025
Situation: Building inspection. According to the client, the foundation had been renewed. There was no crawl space.
Findings:
- On the first floor, height differences in the floor could be seen and felt.
- Cracks through the building, seen as traces of earlier subsidence.
- Whether the extension has a foundation was not known. The shed probably stands on nothing.
Advice and costs: Check for yourself whether the foundation really has been renewed (that falls under the buyer’s duty to investigate) and look in the building file to see how the extension was founded.
What this shows: Even if the main house has been renewed, the extension and shed can still stand on the old ground.
Case 5: Detached house from 1910, Zaandam, April 2026
Situation: Building inspection without a quick scan. During the inspection the seller’s estate agent said the foundation had been completely renewed.
Findings:
- There were no documents to show this.
- Several interior doors stuck, possibly a sign of settlement. Rehanging: € 400.
- Many false walls, so the walls behind them could not be assessed.
Advice and costs: Ask for proof that shows beyond doubt that the foundation has been completely renewed. If in doubt: investigate before signing.
What this shows: A verbal statement is not proof, and false walls only make the picture less certain.
Measured subsidence
Case 6: Detached house, Westzaan, October 2025
Situation: Building inspection with a quick scan. The top soil layers are peat and clay.
Findings:
- Bed-joint measurement: the middle of the house is lower than the front and rear facades. Rear left 27 mm over 2.2 metres, a rotation of 1 in 81.
- Ground floor about 40 mm over less than 3 metres, first floor about 30 mm over just under 3 metres.
- Cracks in the left side facade, probably caused by the settlement on that side.
Advice and costs: Foundation risk poor. Phase 2 to assess the piles, and on purchase place monitoring bolts and measure every year for at least five years.
What this shows: A sloping floor can also come from sagging joists. Only when the upper floor showed the same picture did the foundation become the likely cause.
Case 7: Detached building from 1855, Zaandijk, April 2025
Situation: Building inspection with a quick scan of a partly rendered building with timber parts.
Findings:
- Front facade: right side about 34 mm lower than the left. Rear facade: left side about 65 mm lower than the right.
- Cracks all round and bulging at the front facade.
- Monitoring bolts, but only on the front facade. Several foundations in the area have already been repaired.
Advice and costs: Request the readings before the purchase (above 3 mm per year, further investigation), extra monitoring bolts on the other facades and phase 2 for more certainty.
What this shows: The monitoring bolts were on the front facade, but the rear facade had subsided the most.
Case 8: End-of-terrace house from 1901, Zaandam, August 2025
Situation: Building inspection of an empty house with a timber floor and a rendered facade.
Findings:
- Front facade left 21 mm lower than right, increasing from the middle. Ground floor at the back 34 mm lower than at the front.
- The upper floor sagged clearly in the middle; load-bearing walls downstairs may have been removed.
- A lot of rubble in the crawl space and in places over 29% moisture in the joists.
Advice and costs: First a structural engineer, then monitoring bolts and phase 2 if needed, all before signing.
What this shows: Not every sloping floor is foundation subsidence. An old renovation can just as well be the cause.
Case 9: Semi-detached house from 1925, Krommenie, December 2022
Situation: Phase 1 investigation for the buyer, in a foundation risk area.
Findings:
- Front and rear facades almost straight (8 mm).
- Along the side facade a 37 mm difference between the middle of the front facade and the rear right: the front has subsided.
- No cracks in the facades, apart from one crack at the stove pipe.
Advice and costs: For certainty about the timber piles, a phase 2. An above-ground investigation gives no guarantee about them.
What this shows: Facades without cracks can hide subsidence. Only the measurement along the side facade showed it.
Case 10: Semi-detached house from 1910, Assendelft, July 2021
Situation: Phase 1 for the owners of an empty house, because the floors on several storeys were sloping.
Findings:
- Front facade left 38 mm lower than right; on the first floor about 40 mm.
- The extension was said to have new foundations (11 mm), but there were cracks in the corners between the extension and the rear facade.
- The ground floor had been renewed and was level; the crawl space was very damp.
Advice and costs: Foundation moderate. Phase 2, or otherwise monitoring bolts to measure the speed.
What this shows: A new, straight ground floor hides tilting. The upper floor and the facade did show it.
Extensions, conservatories and sheds
Case 11: Mid-terrace house from 1937, Koog aan de Zaan, February 2026
Situation: Building inspection without a quick scan, in a foundation risk area. There is a conservatory behind the house.
Findings:
- A large crack in the concrete slab of the conservatory; the slab has probably subsided.
- A large crack in the rear brickwork. Photos from the estate agent showed it was already there before the conservatory.
- Repairing the crack and brickwork: € 1,600. If the settlement continues, the conservatory has to come off and a new foundation is needed.
Advice and costs: Request the building drawings and check whether the conservatory stands on piles. Take the risk of further subsidence into account.
What this shows: Old photos helped here to separate two cracks with different causes.
Monitoring bolts without a series of readings
Case 12: Mid-terrace house from 1930, Zaandam, March 2025
Situation: Building inspection without a quick scan, in a foundation risk area.
Findings:
- Monitoring bolts at the front. They say nothing about the back.
- Several cracks around the house; one thermal, the others possibly settlement cracks.
- We included € 700 for additional foundation investigation.
Advice and costs: Request the readings and have a specialist foundation investigation done before signing.
What this shows: Monitoring bolts on one side are a start. The rest of the house falls outside them.
Case 13: Detached house from 1932, Krommenie, June 2026
Situation: Building inspection with a quick scan and archive research. The house has a cellar and a timber joist floor.
Findings:
- Monitoring bolts present, but the readings were not included.
- In the archive: as far as known, the foundation had never been investigated or repaired. According to the drawings, probably timber piles, with clay and peat at the top.
- Bed-joint and plumb measurements: straight to within a few millimetres.
Advice and costs: Request the readings. No reason for further investigation now; phase 2 only for those who want certainty about the piles.
What this shows: A straight facade and an empty archive do not mean the piles are good. The series of readings would complete the story.
Case 14: End-of-terrace house from 1939, Zaandam, May 2026
Situation: Building inspection with a quick scan.
Findings:
- Slight settlement towards the front and left, within the usual margins.
- Diagonal cracks in the front facade, probably caused by that settlement.
- The house was already being monitored with monitoring bolts.
Advice and costs: Request the readings and have it measured every year. Phase 2 only if the settlement speeds up or new damage appears.
What this shows: A few cracks do not mean something has to be done now. They do mean you have to keep following it.
Case 15: Detached house from 1910, Krommenie, October 2024
Situation: Building inspection without a foundation investigation, in a foundation risk area.
Findings:
- Monitoring bolts in the front facade; the readings were not known.
- Side and rear facades had been re-rendered. We could not assess the brickwork underneath.
- Earlier foundation work had been done, without any explanation of what exactly.
Advice and costs: Request the readings and have the earlier work assessed before signing.
What this shows: New render can hide cracks from view.
Timber houses, pad foundations and dyke houses
Case 16: Timber house from 1740 on a dyke, Assendelft, July 2022
Situation: Building inspection with an inspection of the crawl space.
Findings:
- Several pad foundations had subsided and were crooked, old and new mixed together, on peaty ground.
- No drawings showing that the pads stand on piles.
- Floor joists seriously affected by wood rot (€ 30,000) and woodworm almost everywhere.
- Renewing the foundation: at least € 150,000.
Advice and costs: Check with the municipality and the water board whether and how the foundation may be renewed, because the house stands on a dyke.
What this shows: With a timber house on pad foundations, the condition of the pads is the foundation.
Case 17: Dyke house from 1931, Zaandam, July 2021
Situation: Building inspection without a foundation investigation. The advice was negative.
Findings:
- At the neighbours’, a large crack in the facade and monitoring bolts; many houses in the area have foundation problems.
- The hatch to the crawl space had been screwed shut.
- A damp semi-basement with salt efflorescence on the walls.
- We warned of a cost item of at least € 200,000 for the foundation.
Advice and costs: Do not buy without answers to the questions about the crawl space, steel, sewer and foundation.
What this shows: What is going on at the neighbours’ says a lot when you cannot look under the floor yourself.
Crawl space and soil
Case 18: Detached house from 1987, Wormer, November 2025
Situation: Crawl space inspection. The house stands on a ring beam with concrete piles.
Findings:
- The soil has settled: a gap has formed under the ring beam.
- At a flower border the ground around one pile had washed away further than at the others.
- A lot of condensation on the floor insulation; the reinforcement of the permanent formwork is rusting.
Advice and costs: Top up the soil, improve ventilation, remove the border and pave it with a fall, and have the water pipe checked for leaks.
What this shows: The ground also sinks under a house on concrete piles. You only see that in the crawl space.
Case 19: Family house from 1936, Zaandijk, February 2023
Situation: Crawl space inspection of an empty house.
Findings:
- Floor joists above 35% moisture, where 12% is normal. The ground was soaking wet and the pad foundations were saturated.
- The steel supporting beam was badly rusted through at the facade (€ 1,800).
- A large hole in the front facade around the sewer and pipes, through which sand can run away (€ 400). Everything together € 7,000.
Advice and costs: Improve ventilation, clean the ground, apply a layer of shells and check the joist ends.
What this shows: A wet crawl space affects not only wood, but also steel and brickwork at the bearing points.
Case 20: Semi-detached house from 1934, Zaandam, October 2025
Situation: Building inspection in a foundation risk area.
Findings:
- Several cracks in the facade, repair € 3,750. Here too, monitoring bolts without known readings.
- The joist floor had more than 33% moisture, with brown rot at the joist ends built into the walls. Replacement: € 15,000, excluding clearing and finishing.
Advice and costs: Request the readings and have the cause of the cracks investigated before signing.
What this shows: Rotten joist ends cost a lot of money, regardless of whether the piles are good.
Signs that come back
Case 21: End-of-terrace house from 1899, Wormerveer, October 2026
Situation: Building inspection without a quick scan, in a foundation risk area.
Findings:
- Several facade cracks; some had been repaired before and had opened up again.
- Facade recently rendered and many false walls inside.
- The floor joists had been replaced earlier and rested on steel sections with rust in places; over 29% moisture.
Advice and costs: Before signing, a foundation investigation, plus a destructive crawl space investigation.
What this shows: Cracks that come back after repair point to movement that is still going on.
Case 22: Mid-terrace house from 1938, Zaandam, July 2024
Situation: Building inspection without a foundation investigation.
Findings:
- Cracks in the brickwork in many places, large cracks in the brickwork below the front windows.
- Windows and doors stuck in many places.
- The balcony appeared to have subsided, with a crack at the connection to the rear facade.
Advice and costs: A foundation investigation before signing, and ask the municipality and the neighbours.
What this shows: One sign says little. Here cracks, sticking windows and a subsided balcony all pointed the same way.
Good news
Case 23: Semi-detached house from 1973, Wormer, October 2024
Situation: Building inspection with a foundation investigation.
Findings:
- Facades 11 to 15 mm, garage 3 and 5 mm. Ground floor about 19 mm from front to back.
- Cracks in the facade, but the foundation as the cause was not plausible: no expansion joints and possibly poor brickwork.
- There was, however, a precast concrete floor of a type known as a problem floor.
Advice and costs: The foundation gives no reason for concern. Do have the floor investigated before signing.
What this shows: Cracks in a facade do not always come from the foundation.
Case 24: Detached house from 1979, Westzaan, August 2025
Situation: Building inspection with a quick scan of a house with a thatched roof.
Findings:
- Bed joint all round at most 14 mm, probably due to the brickwork itself. Floor at most 13 mm.
- No cracks in the facades; crawl space mostly dry.
Advice and costs: No reason for further investigation.
What this shows: A good result remains an indication, but reassurance also belongs in a report.
Case 25: End-of-terrace house from 1988, Zaandam, October 2024
Situation: Building inspection with an above-ground foundation investigation. Concrete floor on a ring beam with concrete piles.
Findings:
- There was a lot of water in the crawl space.
- Bed joint all round from -1 to +2 mm. Upper floor almost level.
Advice and costs: No further foundation investigation needed. Do install mechanical ventilation with a humidity sensor (€ 1,250) and extra vents (€ 600).
What this shows: Water in the crawl space is a damp problem, not automatically a foundation problem.
Case 26: Detached house, Oostzaan, August 2025
Situation: Quick scan in a foundation risk area.
Findings:
- Bed joint all round at most 10 mm. Ground floor at most 19 mm over 10 metres.
- No cracks or bulging.
Advice and costs: No reason for further investigation. If the house stands on a shallow foundation, monitoring bolts are a better choice than phase 2.
What this shows: Which follow-up makes sense depends on the type of foundation.
From older reports (2016 up to and including 2023)
Reports from Google Docs and email from before our current reporting software. The largest measurements from the region are in here.
Case 27: Family house from 1930, Jisp, September 2016
Situation: Building inspection for an owner who wanted to renovate.
Findings:
- The house almost certainly stands on a shallow foundation, without timber piles. Heavy traffic in the street causes vibrations.
- Floor levelling: the front is about 5 to 7 cm lower than the back.
- Outbuildings and extension had all subsided; we did not expect a collapse.
Advice and costs: Have monitoring bolts placed and follow them. No urgent repair, but check the joist ends during the renovation.
What this shows: A large height difference does not always mean immediate repair. Measuring over a few years shows whether it is still moving.
Case 28: Timber house with a brick front facade from 1901, Zaandam, December 2017
Situation: Pre-purchase inspection.
Findings:
- Measured with the laser: the back has subsided and the floors are not level.
- The front facade bulges.
- Monitoring bolts were only in the brick front facade, not on the timber structure behind it.
- Replacing the foundation in due course: about € 50,000 (price level 2017).
Advice and costs: Allow for replacement in due course, and do not see the readings of the front facade as proof for the whole house.
What this shows: A stable brick front facade says nothing about the timber house behind it.
Case 29: Family house from 1910 on a dyke, Zaandam, January 2018
Situation: Pre-purchase inspection. According to the seller’s estate agent, the foundation had been renewed, with a concrete perimeter foundation and a guarantee.
Findings:
- The crawl space was full of water, so the perimeter foundation could not be seen completely.
- In the middle under the floor, the supporting beam stood on a pad that was collapsing and almost certainly has no foundation.
- The floors, especially on the first floor, were clearly sloping.
Advice and costs: Check the guarantee and how the repair was carried out yourself. New concrete beams with a beam-and-block floor: at least € 15,000 (price level 2018).
What this shows: A new perimeter foundation under the facades says nothing about loose pads under the floor.
Case 30: End-of-terrace house from the early twentieth century, Wormerveer, January 2018
Situation: Pre-purchase inspection.
Findings:
- Bed-joint measurement: rear left more than 6 cm subsided compared with the front, confirmed by a large crack in the rear facade.
- There were several monitoring bolts.
- A bathroom floor of about 10 cm of concrete on the timber joists.
Advice and costs: Plan the repair for the long term, together with the adjoining building: at least € 80,000 including the interior downstairs (price level 2018).
What this shows: With linked houses, repair only makes sense together with the neighbours. A heavy floor on timber joists makes it worse.
Case 31: Family house from 1922, Westzaan, January 2018
Situation: Pre-purchase inspection of an unoccupied house. The estate agent supplied a monitoring bolt report.
Findings:
- Front left about 2 cm subsided; otherwise the floor was reasonably straight.
- Home-made brick pads under the steel supporting beam had subsided, because they have no foundation.
- Damp crawl space and brown rot in joist ends (€ 1,500, price level 2018).
Advice and costs: Have the monitoring bolts measured every year and add wedges under the supporting beam.
What this shows: Loose pads on wet ground sink away, even when the house itself hardly moves. That explains sloping floors.
Case 32: Family house from 1923, Koog aan de Zaan, December 2018
Situation: Pre-purchase inspection for a buyer who wanted to build a large extension. According to the estate agent, the foundation had been renewed.
Findings:
- There was no proof of the repair in the documents.
- The floors on the first and second floors were sloping considerably.
- Cracks in the facade and subsidence above window frames, traces of the old subsidence.
Advice and costs: During the renovation, have the floors levelled and the facade cracks repaired.
What this shows: A new foundation does not remove the old tilt.
Case 33: Family house from 1910, Krommenie, February 2020
Situation: Pre-purchase inspection for a buyer who wanted to renovate. According to the estate agent, the foundation had been renewed.
Findings:
- We could not assess whether that had been done properly.
- This house and the house next door had both subsided considerably.
- If the house next door subsides further, that can cause new cracks in the facades.
Advice and costs: Find out how and where the repair was done and what the state of the neighbours’ foundation is.
What this shows: Repairing one house does not protect it against the neighbours.
Case 34: Detached house from 1913, Wormerveer, April 2023
Situation: Pre-purchase inspection in a foundation risk area.
Findings:
- An indicative floor levelling showed more than 12 cm of tilt.
- The tilt could also be clearly seen on the facades; windows at the front stuck and the frames were distorted.
- In the cost table the foundation was a p.m. item (an amount still to be determined).
Advice and costs: Additional foundation investigation by a specialist.
What this shows: A p.m. item means that the largest cost item is still open.
From the surrounding area: Waterland, Beemster and Purmerend
Outside the Zaan region itself, but with the same soft soil and the same patterns.
Case 35: Corner building from 1895, Edam, November 2019
Situation: Pre-purchase inspection of a building with a home and a restaurant or bar.
Findings:
- The building stands on a shallow foundation, like many houses in the old centre. Large cracks in the facade caused by subsidence.
- The kitchen is in an extension that has subsided separately, with a crack in the floor.
- New foundation at least € 150,000 including renovation, new foundations for the extension at least € 20,000 extra (price level 2019).
Advice and costs: First the foundation, the extension separately, and only then the facade and pointing.
What this shows: An extension often has its own, lighter foundation and needs its own cost item.
Case 36: Detached house from 1920, Broek in Waterland, February 2020
Situation: Pre-purchase inspection of an unoccupied house.
Findings:
- Floor levelling: the house had subsided by more than 25 cm.
- Large cracks in the facade.
- With repair, the crawl space and joists make way for a concrete floor and the kitchen has to come out: at least € 150,000 (price level 2020).
Advice and costs: Allow for a full repair and a new ground floor before any renovation.
What this shows: Foundation repair almost always also affects the floor, kitchen and finishing.
Case 37: Detached house from 1905, Beets, May 2026
Situation: Building inspection with a quick scan. According to the information given, the extension was about 25 years old.
Findings:
- Cracks down to below ground level; previously repaired cracks had come back.
- The house subsides strongly towards the rear right, the extension the other way, towards the main house.
- The front door no longer opened normally and the upper floors sloped.
Advice and costs: Phase 2 before signing, and allow for a very large setback.
What this shows: When the main house and the extension subside differently, it cracks at the joint.
Case 38: Detached house from 1938, Zuidoostbeemster, May 2026
Situation: Quick scan in an area marked as vulnerable on the foundation viewer.
Findings:
- Borehole profile: clay to 2.5 to 6.5 metres, then sand, and below that clay again.
- The main house subsides to the right and front, the extension to the back and right.
- Largest deviation about 18 mm over 4 metres (1 in 222); cracks that look structural between the utility room and the extension.
Advice and costs: Monitoring bolts and preferably measure every year.
What this shows: A small tilt can still cause cracks if two parts move differently.
Case 39: Farmhouse from 1970, Warder, March 2026
Situation: Building inspection with a quick scan.
Findings:
- Facades almost straight (10 and 16 mm), no cracks or sticking doors.
- The blinding layer in the crawl space had subsided because the soil had settled; parts were hanging in the air and the sewer was leaking.
- For the crawl space € 17,500.
Advice and costs: Have the crawl space and sewer repaired; phase 2 if in doubt, before signing.
What this shows: A house can stand straight while the ground under it sinks away.
Case 40: Mid-terrace house from 1875, Oosthuizen, April 2025
Situation: Baseline survey (nulmeting), because building work was going to take place on the site behind it.
Findings:
- A stepped settlement crack in the front facade, a crack of about 2 mm in the edge beam of the side facade and one of about 3 mm at the shed.
- In the cellar the floor joists rested on brick pads from different periods.
Advice and costs: Monitoring bolts or vibration meters during the building work.
What this shows: Without a record beforehand, later damage can hardly be attributed.
9. What we count in our reports
Our dataset contains 196 of our own reports from the Zaan region and surroundings, up to and including October 2026. For 84 foundation investigations, building inspections and crawl space inspections from our reporting software (2021 up to and including October 2026), we searched the full text. This gives the following picture:
- More than half of the homes with a known year of construction (41 of the 78) date from before 1940.
- In about two out of three reports we describe cracks in the facade or interior walls. That says nothing yet about the cause.
- In about one in five reports we establish or suspect subsidence or tilting.
- In 21 reports it is stated explicitly that the home is in a foundation risk area.
- In 8 reports the seller, the occupant or the estate agent said the foundation had been renewed. In none of these cases was there any paperwork.
- In 8 reports we found monitoring bolts; the readings were almost never available at the inspection.
- In 16 reports there is a measured height difference in millimetres. Half stayed below about 2 cm, five reached 3 cm or more; the largest difference was 65 mm across a rear facade in Zaandijk.
We also read 83 older inspections and foundation investigations from Google Docs and email. In 27 of these we judged the foundation to be poor or suspected so, in 7 an extension had subsided and in 6 the selling party said the foundation had been renewed. The largest measurements are in there too: more than 12 cm in Wormerveer and more than 25 cm just outside the region in Broek in Waterland (cases 34 and 36).
How we count: we only count sentences in which something was established or suspected, not the standard texts that appear in every report. These are not representative figures for all houses in the region: people often call us precisely when they have doubts.
10. What clients write about foundation problems
Our figures come from measurements. What it meant for buyers, we read in the reviews clients leave without being asked on Google and Trustpilot. In summary, without names:
- Several buyers decided not to buy after the foundation investigation or had the purchase contract dissolved, because the foundation turned out to be a much bigger problem than they thought.
- Others used the report in the negotiation. One buyer writes that the price went down by € 75,000 after necessary foundation repair came to light; another included an estimated repair of € 125,000 in the offer.
- A buyer signed a provisional purchase contract with a clause about the foundation. Seller and estate agent mentioned € 10,000 for repair; later € 110,000 was estimated. Thanks to the clause, the purchase could lapse.
- A buyer who was not from the region but knew about the foundation problems writes that the measurement revealed considerable subsidence in a house he had fallen in love with.
- An owners’ association (VvE) has had the building measured every year since our inspection, to see how fast it is subsiding.
- An owner was told that cracks in the joints of his new-build home were settlement and that a foundation investigation was not needed. You get that advice from us too.
- Not everyone was equally satisfied. In a 4-star review a client writes that the phase 0 was as thorough as possible, but that the price felt high for the time on site and the outcome was less clear than hoped, because no bed-joint measurement was possible on that rendered house. That is correct: without a bed joint a quick scan is less certain, and we say so beforehand.
You can read all reviews on our reviews page (in Dutch). Premiumkeur has an average of 4.9 stars from 704 Google reviews and 104 Trustpilot reviews (October 2026).
11. About Premiumkeur Zaandam
- Office: Premiumkeur Zaandam, Jacob Cornelisz van Oostsanenhof 57, 1506 JZ Zaandam. Phone 075-2340777, premiumkeur@gmail.com.
- Company: Premiumkeur B.V., Heiligeweg 30, 1012 XR Amsterdam, Chamber of Commerce (KvK) 81106130. A partnership of independent inspectors under one name; all inspectors carry out foundation investigations.
- Founder: Fred Tokkie. He was a contractor from 1983 to 2009 and has inspected houses since 2009.
- Working method: inspections following NTA 8060, NEN 2767 certified, NHG recognised. Foundation investigation phase 1 and 2 following the KCAF guideline.
- Independent: no business ties with estate agents, mortgage advisers, valuers, notaries or foundation repair companies. We do not inspect on behalf of sellers.
- Area for foundation investigation (pages in Dutch): Assendelft, Den Ilp, Ilpendam, Jisp, Koog aan de Zaan, Krommenie, Landsmeer, Oostknollendam, Oostzaan, Purmerend, Westknollendam, Westzaan, Wijdewormer, Wormer, Wormerveer, Zaandijk and Zaandam.
- Learn more: the foundation investigation knowledge base of Premiumkeur Funderingsonderzoek goes deeper into measuring methods and repair, and on our YouTube channel you can see how we inspect.
Related articles
- Structural Inspection Zaandam: what a structural inspection of a Zaan house covers, from the crawl space to the roof, with cases and reviews from the region.
- Foundation Inspection Amsterdam: the same questions for houses in Amsterdam, with eight Amsterdam cases.
- Knowledge base foundation investigation (Amsterdam): measuring methods, phases and repair costs explained for Amsterdam.
- Buying a House in Amsterdam: the Dutch buying process for expats step by step, from offer to transfer.
Frequently asked questions about foundation investigation in the Zaan region
Should I have a foundation investigation done in the Zaan region?
Our advice is yes for every house built before 1970. Pre-war Zaan houses usually stand on timber piles, and the year of construction says nothing about their condition. A quick scan can be done during the building inspection; together this costs from € 898.
The seller says the foundation has been renewed. What should I ask?
Ask for the foundation report, the repair plan or drawings, the invoices, the completion report and the guarantee, and ask whether the whole house has been repaired or only part of it. Without those documents we assume the original foundation.
What does a foundation investigation at Premiumkeur cost?
A quick scan (phase 0) costs € 399 and can only be booked together with a building inspection. Phase 1 costs € 699 to € 1,499, phase 2 from € 3,000 excluding excavation work. Monitoring bolts (8 to 10) cost € 1,179. All prices include VAT.
What is the difference between phase 0, phase 1 and phase 2?
Phase 0 and phase 1 are above ground: we measure facades and floors and look at cracks and the archive, phase 1 in more depth. In phase 2 the foundation is excavated and the piles are assessed. Only phase 2 gives certainty about the piles.
There are monitoring bolts on the house. Is that bad news?
Not necessarily. It means the building is being followed, usually by the municipality. Ask for the readings: only a series of measurements shows how fast the house is subsiding. If the bolts are only on the front facade, you know nothing about the back.
How do I know whether an extension has a proper foundation?
Ask for the building drawings and look in the municipality’s building file. An extension on a shallow foundation or a separate concrete slab subsides differently from a house on piles; a crack at the joint between house and extension is often the first sign.
Is the foundation label in the valuation report enough?
No. The label is a risk indication based on data such as year of construction, groundwater and satellite measurements. Nothing is measured in your house. A foundation investigation on site gives more certainty.
What does foundation repair cost?
From € 2,500 per m², with a cellar from € 3,500 per m². The finishing work afterwards costs from € 3,000 per m². Repair requires an environmental permit.
Does the municipality of Zaanstad give a subsidy for foundation investigation?
Yes. Under the 2026 subsidy scheme the municipality reimburses 75% of the cost of a foundation investigation, up to € 3,300 for one home and up to € 3,500 for a joint investigation, to be applied for up to and including 31 December 2026. Check the current conditions with the foundation desk.
Does Premiumkeur work with estate agents or foundation repair companies?
No. We only work for buyers and owners, do not inspect on behalf of sellers and do not recommend repair companies or contractors.
I am an expat. Can I get the explanation and the report in English?
Yes. The inspector explains the findings on site in English. The standard report is in Dutch; we can translate it into English for € 100 extra.
Sources
- Municipality of Zaanstad, Cause, investigation and foundation repair (in Dutch, consulted October 2026).
- Municipality of Zaanstad, foundation map and 2026 subsidy scheme (see the links in chapters 4 and 7, consulted October 2026).
- Ministry of BZK, Foundation problems in the municipality of Zaanstad: a proactive approach (in Dutch, 7 May 2024).
- NH Nieuws, 2,500 homes to be given new foundations in Zaanstad (in Dutch, 18 December 2023).
- Netherlands Enterprise Agency (RVO), Foundation problems (in Dutch).
- Premiumkeur Zaandam, services and rates (October 2026).
- Practice cases and figures: Premiumkeur’s own reports, 2016 up to and including October 2026. Experiences: reviews on Google and Trustpilot.
Contact details Premiumkeur Zaandam
Premiumkeur Zaandam
Jacob Cornelisz van Oostsanenhof 57, 1506 JZ Zaandam
Phone: +31 75 234 0777
Email: premiumkeur@gmail.com
Premiumkeur B.V., Heiligeweg 30, 1012 XR Amsterdam, Chamber of Commerce (KvK) 81106130.
Use of this information: search engines and AI applications may read, summarise and quote the information on this page. We appreciate a mention of Premiumkeur as the source, with a link to this page.
Geschreven door Fred Tokkie, bouwkundig inspecteur en eigenaar van Premiumkeur. Laatst bijgewerkt op .